An equipment vendor was working on a compact three-phase device that could be truly disruptive in its industry, which is often traditional and slow to change. The vendor needed to launch the product quickly, before a competitor could catch on and beat them to it.
But the design proved highly challenging. It would need a common mode choke to eliminate potential noise issues, but significant space restrictions, performance demands, and the innovative nature of the product itself meant no off-the-shelf solution could do the job.
In the Smoothing the Power case study, find out how the vendor teamed up with Standex to get a never-before-seen product on the shelves despite complex requirements and an unstable supply chain.